Rehabilitation of the Kotsiatis Uncontrolled Landfill Site (UCLS)
Rehabilitation of the Kotsiatis Uncontrolled Landfill Site (UCLS)
Rehabilitation of the uncontrolled waste disposal site in Kotsiatis, including the excavation and transport of 1.5 million m³ of waste, installation of sealing membranes and soil cover systems. A 3 km biogas transmission network, a flaring unit, and an environmental monitoring system were also installed.