Infrastructure Project

Rehabilitation of Uncontrolled Landfill Sites

Rehabilitation of Uncontrolled Landfill Sites in the Nicosia District

Rehabilitation of 24 uncontrolled waste disposal sites in the Nicosia District. Ten landfill sites are being rehabilitated through excavation and transfer of waste, while the remaining 14 are being rehabilitated in situ with measures implemented according to the risk potential of each site.

24

Locations

-

Signature of contracts

January 2024

Starting Date

July 2025

Completion Status

Nicosia

Location

€ 8.750.000

Value